Location: Greendykes Road, Broxburn, West Lothian.
Client: West Lothian Council
Status: Ongoing.
Details: : Works to rebuild two flats that had to be demolished due to extensive fire damage.
-
Floor joists and internal partitioning in place, windows to be fitted
-
View of the south east facing aspect with scaffolding and safe walkways in place.
-
South facing aspect with scaffolding in place and building materials arriving.
-
Internal view of new extension.
-
Internal view towards original wall.
-
New end section with supports temporarily in place.
-
View along the scaffolding on the south facing wall.
-
View through a window aperture toward the east facing gable.
-
View over the open top of the new section.
-
South facing aspect showing scaffolding in place.
-
North facing aspect showing the external walls being constructed. Note that the windows are now in place.
-
Alternative view of the north facing aspect.
-
Windows now in place and external walls are being constructed.
-
Internal partitions being constructed with ceilings now in place. Construction materials are safely stored indoors.
-
View of fire damage to what was originally the exterior door.
-
The new roof for the extended property is now in place.
952 false false false
Location: Bathgate
Client: Warrington
Status: Complete
Details: The installation of roof trusses to a building where the use of a crane was required due to limited access.
-
Crane in position for installation of roof trusses.
-
Crane in position.
-
Tight access at this property.
-
Crane jib in position for initial lift.
-
Crane view.
-
Trusses being lowered into position.
-
Slings in position.
707 false false false
Location: South Queensferry, West Lothian.
Client: Balfour Beatty Rail.
Status: Complete.
-
Contruction of foundations, excavation, timber formwork and concrete finishing in preparation for railtrack fabrication machinery.
-
Installation of timber formwork in preparation for new concrete poured foundations.
-
Construction of new amenities building.
-
Concrete pour to perimeter of foundation.
-
Completed concrete foundation ready for the installation of railtrack fabrication machinery.
183 false false false
Location: Whitehill Industrial Estate, Bathgate, West Lothian.
Client: Warrington Property Maintenance.
Status: Complete.
-
Preparation of the site prior to building.
-
Erection of the steel frame.
-
Close-up of steel frame.
-
Interior of unit with concrete floor newly completed.
-
Interior of unit, electrics completed and office, toilets, kitchen and storerooms blockwork partitions completed.
-
Exterior of completed units, groundworks ongoing.
513 false false false